Menu
Home Find a Job Consultancies & Tenders Companies Candidates Blog Webinars
Post a Job Create Employer Account Save jobs, create a free account
Sign In Sign Up
Recruitment263
Home Jobs Consultancies Companies Candidates Blog
Post a Job
Sign In
Home / Jobs / Construction & Infrastructure / Tender 11/26: Borehole Drilling, Casing, Development and Capacity Testing, BRACES Project, Binga District (Wards 13 and 19)
AZ

ActionAid Zimbabwe Verified employer

Tender 11/26: Borehole Drilling, Casing, Development and Capacity Testing, BRACES Project, Binga District (Wards 13 and 19)

Harare

  • Tender
  • Construction & Infrastructure

Closes 23 Nov 2026

Apply by email Save

Job details

Type
Tender
Category
Construction & Infrastructure
Duty station
Harare
Closing date
23 Nov 2026
Posted
13 hours ago
Funding
Adaptation Fund: Be Resilient Zimbabwe Plus (BRACES Project, with UNESCO)

Full job description

About the role

Technical Specifications, Scope of Works and Method Statements For Borehole Drilling, Casing, Development, and Capacity Testing

BRACES Project, Binga District (Wards 13 and 19). TENDER 11/26.

PART A: GENERAL REQUIREMENTS

A1 Project background and purpose

ActionAid Zimbabwe (AAZ), UNESCO and the Government of Zimbabwe, through the Ministry of Lands, Agriculture, Fisheries, Water and Rural Development, are collaborating on the Adaptation Fund-supported Be Resilient Zimbabwe Plus Project titled, “Strengthening Local Communities’ Adaptive Capacity and Resilience to Climate Change through Sustainable Groundwater Utilization in Zimbabwe.” The Be Resilient Zimbabwe Plus project seeks to strengthen climate adaptation and community resilience in Binga and Buhera through sustainable groundwater utilisation for food security and other productive purposes. The project includes groundwater resource assessments in the Lower Gwayi and Upper Save sub-catchments; strengthened technical, institutional and human capacities for water and land management; demonstration of practical adaptation measures; and learning to inform replication and scale-up. In Matabeleland North, Binga District, AAZ is implementing components of the Be Resilient Zimbabwe Plus project through the Building Resilient Communities and Environmental Sustainability (BRACES) Project in Ward 13 (Saba-Lubanda) and Ward 19 (Pashu). A core output is climate-smart water and food security infrastructure built around Village Business Units (VBUs): fenced community gardens, solar-powered irrigation systems, livestock watering and domestic supply, with four VBUs per ward (one at a school) and one Piped Water Scheme per ward. Each VBU and scheme needs a reliable, safe, solar-pumped groundwater source. This document specifies the works needed to drill, construct, test, and complete those boreholes.

A2 Lots, quantities and locations

The total scope is 18 boreholes: 8 VBUs × 2 boreholes = 16 boreholes, plus 2 Piped Water Schemes × 1 borehole = 2 boreholes. Each ward has 9 boreholes (4 VBUs × 2 plus 1 scheme). These figures are used identically in A2, C1, the Bill of Quantities (Annex E2) and the Site Schedule (Annex E5).

Lot 1: Drilling, casing, development, sanitary seal and headworks, Ward 13. Boreholes: 9. Sites (see Annex E5): Ward 13: VBUs 1, 2, 3 and 4 plus 1 water piped scheme.

Lot 2: Drilling, casing, development, sanitary seal and headworks, Ward 19. Boreholes: 9. Sites (see Annex E5): Ward 19: VBUs 1, 2, 3 and 4 plus 1 water piped scheme.

Lot T: Capacity testing (4-hour step test and 8-hour constant-rate test), water quality sampling and laboratory testing, disinfection. Priced as rates only. Boreholes: up to 18. Sites (see Annex E5): All sites. May be awarded to the Lot 1 to 3 contractors for their own boreholes, or as one stand-alone lot.

  • Award structure. AAZ intends to award three drilling contracts to three different contractors, six boreholes each (Lots 1 to 3).
  • Lot T (capacity testing). Testing is priced as rates only in Section 4 of the BOQ and is not part of the Lot 1 to 3 totals. AAZ reserves the right to award Lot T to the drilling contractor of each lot at the quoted rates, or to award all or part of it as a stand-alone lot to another qualified contractor (Part B5). The Contractor performing the testing is the “Yield Testing Contractor”.
  • Locations. VBU names and approximate coordinates (decimal degrees, WGS84) will be shared by AAZ in site schedule. Lot boundaries are fixed by the Site Schedule. Quantities are indicative and re-measurable. The Bill of Quantities forms part of the tender documents.
  • Site access to work. Works at any location shall not commence before formal site handover (H1) and a written Site Instruction from AAZ.
  • AAZ’s rights. AAZ may reject non-responsive bids; cancel or withdraw the tender before contract award in line with AAZ and donor procurement rules, with documented reasons; reject non-compliant work on objective technical grounds recorded in writing; issue variations only through the written change-control process in D4; and suspend or terminate contracts only as provided in Part D. After award, depth targets change only by variation (D4).

A3 Roles, supervision and hold points

  • Client: ActionAid Zimbabwe. Client’s Representative: the AAZ-designated project team, who issues Site Instructions and certifies completion.
  • Supervising team: AAZ, the AAZ Engineer (the engineer appointed by AAZ for this contract, who gives every technical approval and certification in this document), the District Water and Sanitation Sub-Committee (DWSSC) technical person, the local Environmental Health Technician (EHT) and a community representative. At least one AAZ representative and one DWSSC representative must be present at every hold point. UNESCO may inspect at any time. The AAZ Engineer gives the technical approvals (H2, H5); the EHT witnesses the water-quality points (H3, H6); the community representative witnesses H1 and H6.
  • Contractor: responsible for method, labour, plant, materials, safety and quality of all works under the lot awarded. The Yield Testing Contractor is responsible for capacity testing, water sampling and disinfection (Lot T).
  • Forms: the AAZ Site Inspection Form completed at each stage, signed by AAZ, community, government/district and contractor representatives, and the Site Instruction Form, are mandatory. No payment is made for a borehole without the signed forms for the stage claimed (D2).

Hold points (H) and witness points (W)

H1: Site handover and pre-drilling verification: marker, coordinates, access and community agreement confirmed; Site Instruction issued. (Siting and community agreement are completed by AAZ and DWSSC before handover; the Contractor attends to confirm the marker and access, receive the Site Instruction and sign the handover record.) Signed by: AAZ, DWSSC, community, contractor.

W1: Mobilisation and material inspection: rig, bits (12 in and 8 in), compressor, certificates for casing, screens, solvent cement, bentonite and gravel, and the approved gravel-placement method statement. Signed by: AAZ, DWSSC.

H2: Approval of casing and screen design after drilling and logging, before casing is lowered. Signed by: AAZ Engineer, Contractor’s hydrogeologist, contractor.

W2: Gravel pack, bentonite seal, backfill and grouting placement (depths measured). Signed by: AAZ, DWSSC.

H3: End of development: water clear, turbidity at or below 5 NTU, sand content at or below 5 mg/L. Signed by: AAZ, EHT.

H4: Verticality and alignment accepted (12 m dummy) and clear depth confirmed; the borehole is capped, locked and handed over to AAZ’s custody with its construction data, awaiting capacity testing. Signed by: AAZ Engineer, DWSSC, Drilling Contractor.

H5: Borehole released by AAZ to the Yield Testing Contractor; approval of step-test discharge rates (based on airlift yield) and start of testing. Signed by: AAZ Engineer, DWSSC, Yield Testing Contractor.

H6: Final acceptance and handover: capacity test report, water quality results, headworks, completion report, Pump Design Data Sheet and Completion Certificate. Signed by: AAZ, DWSSC, EHT, community.

Hold points are passed in order. No work beyond a hold point proceeds until it is signed. H4 precedes H5 because the dummy must pass before a test pump is installed. The headworks (C3.7) follow H4 and do not wait for H5, H6, the capacity test or laboratory results.

A4 Standards, permits and compliance

  • Contractor obligations. The Drilling Contractor must hold, and keep valid for the whole contract, its registration as a drilling contractor with the Zimbabwe National Water Authority (ZINWA). Every Contractor, including the Yield Testing Contractor, must hold and keep valid its corporate, tax, statutory and operating licences and any registration or licence that the law requires for the work it performs (for test pumping, only where the law requires one). Each is responsible for its own compliance with the Water Act [Chapter 20:24], the Environmental Management Act [Chapter 20:27], the Public Health Act [Chapter 15:17], and the requirements of ZINWA and the Gwayi Catchment Council.
  • AAZ obligations. AAZ is responsible for project-level notifications and approvals that fall to the client (including water-related authorisations for the project), community site access and clearance, and the Site Schedule.
  • Drinking water quality: the Zimbabwean drinking water standard (SAZS 560, current edition) and the WHO Guidelines for Drinking-water Quality. Where they differ, the more stringent applies. Annex E1 lists the acceptance parameters (physical, microbiological and chemical) and the report-only parameters (total dissolved solids, total coliforms and the irrigation parameters). The only variance permitted is for iron, and only on a documented technical water-treatment assessment and a written AAZ decision; community acceptance alone is not sufficient. No other variance applies.
  • Materials in contact with drinking water must be non-toxic and certified (for example ISO 1452 for uPVC casing, NSF/ANSI 60/61 or equivalent for drilling additives, bentonite and solvent cement). Equivalent national or regional standards are acceptable only where AAZ approves in writing. All materials are subject to inspection before use; non-conforming materials will be rejected.
  • Safeguarding and conduct: AAZ and UNESCO apply a zero-tolerance policy on sexual exploitation, abuse and harassment (PSEAH). The contractor and all staff must sign the project code of conduct before mobilising. Breaches have the contractual consequences in D12.

A5 Contractor qualifications and key personnel

  1. Drilling Lots 1 to 3. Minimum contractor experience: registered drilling contractor; at least 3 completed borehole contracts of 80 m or more in the last 5 years; own or leased rig with depth capacity of at least 130 m, able to drill a 12 in (305 mm) surface hole and an 8 in (203 mm) main hole; compressor of at least 21 bar / 900 CFM, or another size that the bidder justifies as fit for the Works. Experience of drilling in Binga terrain is a plus. Key personnel (CVs submitted with bid, approved by AAZ): drilling supervisor (at least 5 years) on site throughout; hydrogeologist (may also be the siting hydrogeologist) to log and approve design; test-pumping technician (at least 3 years of capacity-testing experience), required in every bid.
  2. Lot T (Yield testing). Minimum contractor experience: at least 3 completed step-drawdown and constant-rate test assignments in the last 5 years; own or leased test pump (at least 3 L/s at +130 m head), generator, flow meter and dip meters. Key personnel: test-pumping technician (at least 3 years of capacity-testing experience); hydrogeologist or analyst for test interpretation.

The contractor must keep the approved supervisor on site. Replacement of any key person requires prior written approval by AAZ and equal or better qualifications.

A6 Health, safety, environment, safeguarding and community relations

  • Submit a site-specific HSE plan with the bid, covering rig operations, mud pits, manual handling, electrical safety, heat stress (Zambezi valley conditions), snake and wildlife risk, and emergency evacuation. Provide PPE to all workers and a first-aid kit with trained first aider on every site.
  • Fence or mark open mud pits and holes; line mud pits, never discharge drilling fluid or test-pumping water into rivers, wetlands, gardens or near latrines; backfill and restore all pits. Test-pumping discharge must be led at least 50 m from the wellhead and away from drainage to the borehole.
  • Sites must stay clear of project-protected wetlands and gully reclamation areas. Store fuel in bunded containers and remove all waste.
  • Report to the village head and ward councillor on arrival and departure. Respect sacred and burial sites, livestock routes, and cropping schedules. Recruit local unskilled labour from the host ward and include women and youth. No child labour or forced labour. Pay fair wages on time.
  • Establish a simple community complaints channel with AAZ before work starts. Report any incident, injury or safeguarding concern to AAZ within 24 hours.

A7 Programme, access and seasonal risk

Target (bidders propose a work plan)

  1. Drilling lots: 15 calendar days per lot (six boreholes) from the commencement date in the written Notice to Commence to H4 of the last borehole. One rig is the minimum; bidders may propose two rigs or more. Bidders must show that the plan is achievable.
  2. Headworks: built by the Drilling Contractor after H4 and completed within 10 calendar days of H4, per borehole. The headworks do not wait for the capacity test or laboratory results.
  3. Lot T (Yield testing): programme set by AAZ. Each borehole test takes about 14 hours (12 pumping hours plus recovery). The Yield Testing Contractor mobilises within 5 days of AAZ’s notice and tests boreholes in the order released by AAZ at H5.

The rainy season runs roughly from November to March. Sandy tracks and seasonally flooded areas can delay rigs, trucks and test-pumping. Site visits are not mandatory but are encouraged. Bidders must price access and terrain risk and state how rainfall delays will be managed. AAZ may approve time extensions only for documented force majeure, Client-caused delay or an approved variation (D7).

A8 Reporting, payment, retention and defects liability

  • Data standard: all coordinates in decimal degrees (WGS84) with GPS accuracy of 5 m or better; photos geo-tagged; daily records kept on site and open to inspection; reports in English in Word/PDF.
  • Payment is in USD against invoices that follow the BOQ item structure, supported by signed Site Inspection Forms and the deliverables required for that stage. Payment terms are in D2. AAZ pays an approved invoice within 14 calendar days of receipt.
  • Retention: 10 percent of each approved payment under Lots 1 to 3 (including mobilisation) is retained and released at the end of the Defects Liability Period (DLP). There is no retention on Lot T. DLP: 12 months from H6 acceptance of the last borehole in the lot. Defects due to workmanship or materials must be rectified at the contractor’s cost within 14 days of written notice; if not, AAZ may have them rectified by others and deduct the cost from retention.
  • All unused materials, debris and temporary structures must be removed, and each site cleared to the Client’s Representative’s satisfaction before final payment.
  • Errors or omissions found in these documents must be reported immediately, not exploited.

PART B: BID SUBMISSION, EVALUATION AND AWARD (set out under Requirements, below)

PART C: BOREHOLE DRILLING, CASING, DEVELOPMENT, SANITARY SEAL AND CAPACITY TESTING

C1 Scope of works

For each borehole in the lot awarded (18 boreholes in total across Lots 1 to 3) the Contractor shall supply all labour, supervision, plant, transport, materials, fuel, water and consumables to:

  1. Mobilise, establish the site and drill the borehole: a 12 in (305 mm) surface section and an 8 in (203 mm) main hole (down-the-hole hammer permitted in competent rock);
  2. Sample, log and record yields while drilling;
  3. Design (with the Contractor’s hydrogeologist and the AAZ Engineer) and install uPVC casing, screens, sump, centralisers and bottom plug;
  4. Place gravel pack, bentonite seal, backfill and cement grout to form the sanitary seal;
  5. Develop the borehole, test verticality and hand the borehole over to AAZ at H4;
  6. Hand over to AAZ at H4 a clear, capped and locked borehole with its construction data, to await capacity testing;
  7. After H4, and without waiting for the capacity test or laboratory results, construct the wellhead, concrete apron, lockable chamber and identification plate;
  8. Produce the drilling completion report; and
  9. Clear and restore the site.

Lot T scope (Capacity Yield Testing Contractor): capacity testing (4-hour step test and 8-hour constant-rate test with recovery), the test report and the data for the Pump Design Data Sheet (C3.9, C3.10, C3.12). Where one contractor holds both a drilling lot and Lot T, both scopes apply.

C2 Design basis

Pipe sizes are specified by outside diameter (OD) in mm and govern. Hole and bit sizes are given in inches with mm in brackets.

Surface section: depth below ground 0 to 15 m. Hole diameter: not less than 12 in (305 mm) bit. Lining and annular fill: 250 mm OD uPVC Class 10 (PN10) surface casing, grouted in place, with a stick-up of not more than 1.0 m above ground.

Main hole drilling and construction: depth below ground 15 m to terminal / design depth (budgeted maximum 100 m). Hole diameter: drilled in a single pass with a bit of not less than 8 in (203 mm), straight and plumb, to the design depth plus 1 m. Lining and annular fill: 140 mm OD uPVC Class 10 (PN10) casing and screens, solvent-cement jointed, full depth, run from surface through the surface casing, with a stick-up of not more than 1.0 m above ground; annulus of at least 30 mm (gravel pack below 15 m).

Sump: bottom 3 m maximum. Hole diameter: as main hole. Lining: plain 140 mm uPVC Class 10 casing with glued bottom plug.

Stick-up: production casing and surface casing not more than 1.0 m above ground. Casing terminates in sanitary cap inside lockable chamber.

  • Depth: drilled depth follows the siting report and must penetrate the shallow aquifer to tap the productive aquifer. The budgeted maximum is 100 m. Additional depth requires a written Site Instruction and is paid at the tendered extra-depth rate. The driller drills one extra metre below the design depth to leave space for fill (backfill) during casing installation; this metre is not paid separately.
  • Required performance: sustainable yield of at least 1.0 L/s (3,600 L/h) for solar mechanisation.
  • Size chain: the 140 mm casing accommodates a 4-inch solar submersible pump and, in the 8 in (203 mm) hole, leaves an annulus of about 31 mm (at least 30 mm) for the gravel pack. The Contractor’s hydrogeologist may propose alternatives for AAZ Engineer approval at H2 where formation conditions demand (for example 125 mm OD casing, which leaves about 39 mm).
  • Clearances: the annulus outside the 250 mm surface casing in the 12 in (305 mm) hole is about 27 mm and is pressure-grouted (C3.6). Inside the surface casing, the radial clearance around the 140 mm string is about 40 mm (to be confirmed from the casing supplier’s wall thickness) and the 8 in (203 mm) bit passes freely. Joint collars and sockets reduce the annulus locally; their outside diameter must be declared in the bid, approved at W1, and must not prevent gravel placement. The Contractor must submit at W1 a method statement showing how gravel will be placed without bridging, and AAZ may approve gravel grading for this purpose.
  • Losses of temporary casing, tools or fluids are the contractor’s risk.

C3 Technical specification

C3.1 Drilling method and fluids. DTH drilling with potable-safe bentonite (NSF/ANSI 60 or equivalent). Mud rotary methods are permitted in loose formations (for example Kalahari sand). Polymers or other additives only if non-toxic, biodegradable and approved by AAZ. Keep mud properties within a range that stabilises the hole without sealing aquifers, and thin or flush mud before casing. Drilling fluid costs and temporary casing are included in the metre rates.

C3.2 Hole diameters and depth. As C2. The contractor must keep the hole straight and plumb. Drilled metres are measured from ground level to the accepted depth; metres lost to collapse are not paid.

C3.3 Sampling, logging and interim yield tests.

  • Collect unwashed cuttings at every 1 m (and at each change of formation), lay out in rows of ten, pack in solid polythene bags and label with community, borehole number, date and depth. Deliver the samples to AAZ at completion.
  • Record the penetration time for every metre with a stopwatch, by a nominated crew member, plus bit type and size, loss of circulation and rig downtime with causes.
  • Record all water strikes and carry out an interim airlift yield measurement at the end of each rod after the first water strike, measured with a weir or calibrated vessel.
  • The hydrogeologist produces a lithological log with water strikes, penetration log and yield data (daily and final), using the log in Annex E4.

C3.4 Casing, screens, centralisers and bottom plug.

  • Production casing: 140 mm OD Class 10 (PN10) uPVC, drinking-water grade, in 6 m lengths, permanently joined with high-pressure solvent cement and external uPVC alignment collars or sockets. The solvent cement must be certified for potable water (A4). The Contractor must ensure joints are fully cured before lowering the string, keep the string suspended, and protect pipes in transport and storage to prevent bending or deformation.
  • Screens: factory-made slotted uPVC, 140 mm OD, slot width 0.8 to 1.0 mm (finer slots, for example 0.5 mm, in fine sediments, selected from sieve analysis) and open area not less than 9 percent per linear metre. The contractor takes responsibility for screen design and positions, to be approved at H2. Screen the productive zones with a margin of at least 1 m above and below each.
  • Centralisers at 6 m intervals on casing and screens, of a low-profile type that clears the surface casing.
  • Sump of not more than 3m with a dedicated uPVC bottom plug glued to the lowest pipe. Concrete plugs are not permitted.
  • Surface casing: 250 mm OD Class 10 (PN10) uPVC set to 15 m, with a stick-up of not more than 1.0 m, kept central in the hole, grouted on the outside and left plumb. No fixed waiting period applies before drilling resumes, but the Contractor remains responsible for the integrity of the seal (D3).

C3.5 Filter pack. Clean, well-rounded hard quartz gravel (no crushed stone, weathered or calcareous material). Grain size 1 to 4 mm with slots of 0.8 mm or wider; 0.5 to 2 mm with finer slots where fine or loose sediments (for example Kalahari sand) are met. Contractors must hold sieves for the sizes used and sieve on site. Place by continuous feed in increments of no more than 3 m, withdrawing any temporary casing in step with the packing, measuring depth by tape after each increment, and extending to 3 m above the top screen. Record the volume placed. Pack volume and placement cost are included in the rate. Placement must follow the method approved at W1 (C2).

C3.6 Bentonite seal, backfill and sanitary seal. Place a seal of at least 3 m of bentonite pellets or chips above the gravel pack, hydrated in place. Backfill with clean cuttings or other approved inert material between the top of the bentonite seal and 15 m. Then place cement grout from 15 m to ground level between the production casing and the surface casing, and pressure-grout around the outside of the surface casing so the first 15 m is fully sealed. The grout is continuous with the concrete apron. Place and measure each stage with the AAZ representative (W2).

C3.7 Wellhead, apron and chamber. Built by the Drilling Contractor after H4. Construction does not wait for the capacity test or for laboratory results, and the chamber lid and sanitary cap must remain removable so that the Yield Testing Contractor can install and remove the test pump.

  • Cut the production casing to a stick-up of not more than 1.0 m above ground (the surface casing to not more than 1.0 m) and fit a lockable, bolted sanitary cap with provision for cable and rising main.
  • Reinforced concrete apron 2.0 m x 2.0 m x 150 mm, sloped at 1:50 away from the wellhead, with a drain channel leading at least 5 m away.
  • Lockable masonry or concrete chamber with a heavy-duty steel lid and two padlock hasps, with a height above the apron of at least the casing stick-up plus 0.2 m (not less than 1.2 m), and an internal size large enough for fittings and a cable and pipe exit.
  • Identification plate (aluminium or stainless steel) showing borehole number, ward, depth, completion date and GPS position, plus project signage supplied by AAZ.
  • Until H4, the Contractor protects the borehole against vandalism and foreign material with a temporary lockable cap. From H4 the borehole is in AAZ’s custody (C3.9, Interface), except for damage caused by the Drilling Contractor’s own headworks work.

C3.8 Development. Develop by jetting (jetting tool moved continuously along the whole screened length using lightweight pipe, not hydraulic hose) and airlift surging. Duration: minimum 1 hour and continuing until the water is clear with no visible sand, sand content at or below 5 mg/L and turbidity at or below 5 NTU measured with a portable turbidity meter. There is no maximum time; hours beyond the minimum are paid at the provisional rate (BOQ 5.2) only where AAZ confirms the extra time was needed. Remove fill from the sump by airlift or bailer. Confirm clear depth by tape. AAZ certifies completion (H3). Any damage caused by development is repaired at the contractor’s cost.

C3.9 Capacity testing (Lot T). The Drilling Contractor estimates the yield (Q) from airlifting during development and certifies the borehole successful or lost. For successful boreholes the Yield Testing Contractor provides and operates a test-pumping unit and carries out the 12-pumping-hour protocol below (4 hours step test plus 8 hours constant-rate test, with recovery monitoring after each, about 14 hours on site):

Step-drawdown test: 4 steps of 60 minutes (4 pumping hours). Rates at 0.50Q, 0.75Q, 1.00Q and 1.25Q, increasing without stopping, approved by AAZ Engineer and DWSSC at H5.

Recovery after step test: at least 60 minutes. Until at least 90 percent of drawdown has recovered. Not paid separately (included in test rate).

Constant-rate test (CRT): 8 pumping hours. At the design rate chosen from the step test, not less than 1.0 L/s, with the dynamic level stabilised. Any deviation must be communicated and approved by AAZ and DWSSC.

Recovery after CRT: at least 60 minutes. Continue to at least 80 percent recovery, pump not removed until finished. Not paid separately (included in test rate).

  • Equipment: submersible test pump capable of at least 3 L/s at the pumping head (+130 m), generator, gate valve, flow meter and calibrated tank/container, electric dip meter graduated in cm with audible signal and light (plus a spare), pump intake set above the top screen and at least 6 m below the predicted pumping level.
  • Discharge control: hold discharge within 10 percent of the target rate. Stoppages of more than 5 minutes cumulatively in the CRT, or fluctuation outside tolerance, void the test, which is repeated after full recovery at the Yield Testing Contractor’s cost.
  • Readings follow the frequency in Annex E3 and are recorded on the AAZ capacity-testing log sheet: dynamic water level, drawdown, discharge, temperature, EC and weather. Pumped water is discharged at least 50 m away.
  • Analysis: report static water level, drawdown, specific capacity, transmissivity (for example Cooper-Jacob), well losses, recommended maximum pumping rate and daily pumping hours, recommended pump setting depth, and sand content at the end of the CRT (not more than 5 mg/L). The AAZ Engineer certifies the test data.
  • Interface: at H4 the Drilling Contractor hands the capped and locked borehole to AAZ, with its construction data (depth, casing tally, screen positions, airlift yield estimate) and a signed handover record. From H4 the borehole is in AAZ’s custody, whether testing is done by the same contractor or by a separate Yield Testing Contractor. At H5 AAZ releases the borehole to the Yield Testing Contractor, who checks clear depth and access, installs the pump and signs the handover record. The Yield Testing Contractor removes and refits the sanitary cap and chamber lid, makes good any damage it causes, and leaves the borehole capped and locked.

C3.10 Water quality testing and disinfection (Lot T).

  • On-site measurements (pH, electrical conductivity, temperature, iron and nitrate test strips) at the start and end of the step test and at the end of the CRT, compared with the Annex E1 limits.
  • Laboratory samples are taken at the end of the CRT in the presence of the local EHT, in sterile bottles, preserved and delivered to an accredited laboratory within the holding time, for all parameters in Annex E1, including bacteriological analysis and the report-only parameters (total dissolved solids, total coliforms, sodium, SAR and bicarbonate). A mobile incubator kit may give indicative faecal coliform results on site, but laboratory results govern. Laboratory results are not a condition for the headworks (C3.7); they decide how the borehole is used (C5).
  • Disinfect each successful borehole after testing; the contractor decides the dose from borehole volume and bacteriological results and records residual chlorine at handover (target 0.2 to 0.5 mg/L).

C3.11 Verticality and alignment. After development and before the test pump is installed, run a 12 m plumb (dummy) whose outside diameter is not more than 15 mm below the casing internal diameter. It must pass freely to the full depth, and deviation must not exceed two-thirds of the smallest internal diameter per 30 m of depth (H4). Failure is corrected by the contractor; if not correctable, AAZ may reject the borehole without payment.

C3.12 Records and completion report. Submit per borehole: site inspection forms; strata, penetration and construction logs; daily drilling reports; interim yield records; development record; test data with graphs; water quality results; chlorination record; photos before, during and after; GPS position; Pump Design Data Sheet (Annex E6: static level, tested yield, recommended pumping rate and setting depth, pumping water level, casing internal diameter, sump depth, water quality notes) for use in designing the solar pumping system; and a Completion Certificate (Annex E6) for signature at H6. The Drilling Contractor submits the drilling and construction records; the Yield Testing Contractor submits test and water quality records.

C4 Method statement

Step 1: Pre-start: submit work plan, equipment list, HSE plan, material certificates (including solvent cement), supervisor CV and the gravel-placement method statement. AAZ inspects casing, screens, solvent cement, bentonite and gravel before use. Control: approved materials (W1).

Step 2: Site set-up after H1: verify marker and coordinates, improve access, level the rig, dig and line mud pit, place spill containment, fence the work area, post safety signs. Control: photos.

Step 3: Drill the surface section to 15 m with a bit of at least 12 in (305 mm), log cuttings, maintain mud. Control: log.

Step 4: Install the 250 mm OD surface casing to 15 m with a stick-up of not more than 1.0 m, kept central; pressure-grout the outside; leave plumb. No fixed waiting period applies before drilling resumes; the Contractor remains responsible for the seal. Control: casing tally, photos.

Step 5: Drill the main hole from 15 m with a bit of at least 8 in (203 mm) to the design depth plus 1 m, sampling every metre, timing penetration, recording strikes and interim airlift yields. Control: strata and penetration logs.

Step 6: AAZ Engineer reviews logs and approves the casing and screen schedule. Control: H2.

Step 7: Assemble and lower the 140 mm casing string: clean and solvent-cement the joints and let them cure, fit centralisers at 6 m, glued bottom plug, tally lengths, keep the string suspended, leave a stick-up of at least 1.0 m and cap the top. Control: casing tally.

Step 8: Gravel pack in increments of no more than 3 m with tape checks to 3 m above the screens; withdraw temporary casing in step. Control: W2.

Step 9: Place the bentonite seal, backfill to 15 m, grout between the production and surface casings to ground level; measure volumes. Control: W2.

Step 10: Develop by jetting and airlifting; remove sump fill; test turbidity and sand. Control: H3.

Step 11: Verticality test with the plumb; estimate yield from airlift and certify successful or lost (notify AAZ immediately if lost); fit temporary lockable cap; hand the borehole over to AAZ’s custody to await testing. Control: H4.

Step 12: Headworks, after H4 and without waiting for testing or laboratory results: cut casing to the stick-up, fit sanitary cap, build apron and chamber, fix identification plate. Control: Site Inspection Form.

Step 13: AAZ releases the borehole to the Yield Testing Contractor, who installs the test pump; step-test rates agreed. Control: H5.

Step 14: Run step test, recovery, 8-hour CRT and recovery, taking on-site water quality measurements and collecting laboratory samples. Control: test sheets.

Step 15: Yield Testing Contractor disinfects the borehole, refits the cap and withdraws equipment. Control: chlorination record.

Step 16: Backfill pits, remove waste and equipment, restore the site. Control: photos.

Step 17: Submit completion report, test report and Pump Design Data Sheet; joint inspection and signature of the Completion Certificate. Control: H6.

C5 Acceptance criteria, lost holes and abandonment

A borehole is accepted (H6) for drinking-water supply only if all of the following are met. A borehole that fails only on water quality is dealt with under “Water quality failure” below.

Sustainable yield: at least 1.0 L/s (3,600 L/h), stable through the 8-hour CRT.

Pumping water level: stabilised above the top of the uppermost screen and not deeper than 45 m below ground at the test rate.

Water clarity: turbidity not above 5 NTU; sand content not above 5 mg/L.

Water quality: the Annex E1 acceptance parameters are met. Report-only parameters do not affect acceptance. Iron: variance only on technical treatment assessment and written AAZ decision.

Verticality: passed (H4).

Construction: as approved design, sanitary seal and wellhead complete, depth tape-checked clear of fill.

Documents: all signed forms, logs, test data, laboratory results, completion report and Pump Design Data Sheet.

Failure is allocated as follows (see D3)

  • Contractor failure (collapse through poor mud control, lost tools, non-plumb casing, uncertified or non-compliant materials, defective sanitary seal, inadequate development, unsuitable method): the hole is not paid. The contractor backfills and seals the hole, restores the site and drills a replacement at an alternative position approved at H1, at its own cost.
  • Verified hydrogeological failure (dry hole or insufficient yield despite works that comply with this specification and the siting report): the hole is paid at BOQ rates for work done and materials installed under written AAZ instruction, after an independent assessment (D3). AAZ then instructs abandonment, conversion or a replacement at a position approved at H1, paid at BOQ rates.
  • Water quality failure: a borehole that meets the yield criterion but fails the Annex E1 acceptance parameters is not a contractor failure unless it was caused by the Contractor’s workmanship or materials, and the drilling and construction work is paid. AAZ makes no further investment in the borehole for drinking water. AAZ decides whether the borehole is used for other purposes (for example irrigation or livestock, using the report-only parameters), corrected by treatment with district approval, or abandoned.
  • After two failed attempts in the same community, the contractor requests AAZ’s decision on relocation.
  • Test failure by the Yield Testing Contractor (void test, equipment fault): the test is repeated at the Yield Testing Contractor’s cost.
  • AAZ may order abandonment at any time. In that case AAZ pays for work done and materials used to the date of instruction, and the contractor removes the rig, salvages materials as directed and backfills the hole.

C6 Measurement and payment

  • Drilling is paid per metre drilled to the accepted depth in the diameter specified (surface and main hole separately); casing, screens and pipes per installed metre; items marked per borehole, per hour or per test are paid at the BOQ unit. Rates include mud, additives, temporary casing, water, transport, fuel, sieving and all incidentals.
  • Quantities are certified jointly by the AAZ Representative, witnessed by DWSSC. A bidder or contractor who disputes a measurement must give written notice within 7 days; the undisputed amount is paid and the balance is referred under D13.
  • Section 4 (capacity testing and water quality) is rate-only. It is paid at the quoted rate per hour or per borehole to whichever contractor performs Lot T, on acceptance of the test report, and is not included in the Lot 1 to 3 contract sums. Recovery monitoring is included in the test rates.
  • Provisional items (extra depth, extra development hours, abandonment and backfill) are paid only on written Site Instruction and measured quantities.

PART D: DRAFT CONTRACT CONDITIONS

These conditions form part of the tender and will be incorporated in the contract without negotiation of the fundamental terms. Items in yellow are to be confirmed by AAZ Finance and Procurement before issue.

D1 Award, signing and conditions precedent

  • AAZ notifies the successful bidder in writing. The contract is signed within 7 days. Conditions precedent to the Notice to Commence: signed code of conduct for all staff, performance security (D5), insurance certificates (D5), approved HSE plan, key personnel confirmed and the approved gravel-placement method statement.
  • The commencement date is the date stated in AAZ’s written Notice to Commence. Completion for a drilling lot is H4 of the last borehole in the lot, with headworks and H6 following the programme in A7.

D2 Terms of payment and retention

Payments are made in USD on measured BOQ quantities, against an invoice that follows the BOQ item structure, is supported by the signed Site Inspection Forms for the stage claimed, and is approved by the Client’s Representative. AAZ pays an approved invoice within 14 calendar days of receipt. Mobilisation (BOQ 1.1) is invoiced 40 percent on rig arrival at the ward with W1 and H1 signed, and 60 percent when H4 is signed for the last borehole in that ward for the lot. Provisional items (BOQ Section 5) are paid only on written Site Instruction and measured quantity. Amounts later shown to result from contractor failure under D3 may be recovered from retention or later payments. Drilling and construction items (BOQ 1.2 to 3.8) are invoiced per borehole once H3 and H4 are signed; headworks (BOQ 3.9) once built and signed off; and Lot T items on AAZ’s acceptance of the test report and laboratory results.

A borehole that is lost, uncompleted or rejected is paid only as set out in C5 and D3. There is no payment for partially completed work except as stated there. Retention applies to drilling only: 10 percent of each approved payment under Lots 1 to 3, including mobilisation, is retained and released at the end of the 12-month DLP from H6 (A8). There is no retention on Lot T; AAZ may withhold disputed amounts.

D3 Risk allocation: workmanship failure and hydrogeological failure

  • Contractor risk: collapse, lost tools and fluids, poor mud control, non-plumb or misaligned casing, defective seals, non-compliant or uncertified materials, inadequate development or any other failure caused by method or workmanship. Remedy: zero payment for the hole; the contractor seals it and drills a replacement at its own cost.
  • Client risk: a borehole drilled strictly in compliance with the specification, the siting report and AAZ instructions that is dry or yields less than 1.0 L/s. Remedy: payment for metres drilled and materials installed at BOQ rates under written AAZ instruction. A borehole that yields enough but whose water fails the Annex E1 acceptance parameters is dealt with under C5 (Water quality failure).
  • Independent assessment. Where the cause is disputed, AAZ appoints an independent hydrogeologist or joint panel to review logs, samples, development and test data, and report within [10] working days. The report decides the allocation of risk for that hole. The cost is borne by the party found at fault.

D4 Variations and change control

No variation, extra-depth drilling or change of scope shall be started without a written Site Instruction and Variation Order signed by the AAZ Client’s Representative before the work. Verbal instructions and unauthorised over-drilling are not honoured or paid. Variations are valued at BOQ rates, or agreed rates where none apply. Time and cost consequences are agreed in the Order

D5 Subcontracting

No subcontracting of drilling, testing or key tasks without prior written approval by AAZ. The Contractor remains fully liable. Approved subcontractors sign the safeguarding code of conduct and the anti-fraud declaration.

D6 Termination

  • For default: by written notice after 14 days’ failure to remedy a material breach, including persistent poor workmanship, abandonment of works, unapproved subcontracting, safeguarding violation or corrupt practice. AAZ then pays for accepted work only.
  • For convenience: on 30 days’ written notice, AAZ pays for work accepted and reasonable demobilisation.
  • Termination must follow documented reasons and the procedure in this Part.

D7 Force majeure

Events beyond the reasonable control of a party that could not have been avoided (for example flooding that closes access, epidemic restrictions, government action) suspend affected obligations. Seasonal rain and sandy tracks that bidders were told to price are not force majeure.

D8 Conflict of interest, fraud and prohibited practices

Bidders and contractors declare any conflict of interest and shall not engage in corruption, bribery, fraud, collusion or coercion. AAZ and the donor may reject a bid, terminate and report breaches, and inspect and audit all records.

D9 Confidentiality and data ownership

All drilling samples, logs, test data and reports belong to AAZ and the Government of Zimbabwe, and must be handed over. The Contractor keeps project information confidential and does not publish it without written consent.

D10 Safeguarding enforcement

Breach of the code of conduct or PSEAH policy leads to immediate removal of the individual and, for serious or repeated breach, termination for default (D8). The Contractor cooperates with investigations and does not retaliate.

D11 Disputes and governing law

This contract is governed by the laws of Zimbabwe. A dispute is first referred to amicable discussion between senior management of AAZ and the Contractor. If not settled within 14 days, it is referred to arbitration under the Arbitration Act of Zimbabwe. Work continues during a dispute.

D12 Taxes

Rates are quoted exclusive of VAT. The Contractor bears all other taxes, duties and levies.

PART E: ANNEXES

Annex E1 Water quality parameters

Acceptance parameters are those of Standards Association of Zimbabwe (SAZS 388:2000) and the WHO guidelines; the more stringent applies. Parameters marked “Report only” are measured and reported but are not acceptance criteria. Iron is the only parameter for which a variance may be approved (A4).

Physical: Turbidity: 5 NTU or less.

Physical: pH: 6.5 to 8.5.

Physical: Electrical conductivity: 2,500 µS/cm or less.

Physical: Colour: 15 TCU or less.

Physical: Odour and taste: Not objectionable.

Physical: Total dissolved solids: Report only (conductivity limit governs).

Microbiological: Faecal (thermotolerant) coliforms / E. coli: 0 per 100 mL.

Microbiological: Total coliforms: Report only (faecal coliforms / E. coli govern).

Chemical: Chloride: 250 mg/L.

Chemical: Fluoride: 1.5 mg/L.

Chemical: Nitrate (as NO3): 50 mg/L.

Chemical: Sulphate: 500 mg/L.

Chemical: Total hardness (as CaCO3): 500 mg/L.

Chemical: Total iron: 0.3 mg/L (variance only on technical treatment assessment and written AAZ decision).

Chemical: Manganese: 0.4 mg/L.

Chemical: Copper: 2.0 mg/L.

Chemical: Zinc: 3.0 mg/L.

Chemical: Arsenic: 0.01 mg/L.

Chemical: Lead: 0.01 mg/L.

Chemical: Cadmium: 0.003 mg/L.

Chemical: Mercury: 0.006 mg/L.

Irrigation (report only): Sodium (Na): Report only (reference value 200 mg/L).

Irrigation (report only): Sodium adsorption ratio (SAR): Report only (reference value 6).

Irrigation (report only): Bicarbonate (HCO3): Report only (reference value 500 mg/L).

Annex E2 Bill of Quantities (summary of quantities)

Rates are entered in the Excel BOQ (provided as a separate document), which is the pricing form. Quantities per lot are shown here for reference. Section 4 is rate-only and is not included in Lot 1 to 3 totals; Section 5 is provisional.

1 MOBILISATION AND SITE ESTABLISHMENT

1.1 Mobilisation and demobilisation of drilling rig, crew and equipment to the ward. Distances: Cross Dete to Ward 13 centre 67 km; Cross Dete to Ward 19 centre 70 km. Unit: Item. Lot 1: 1. Lot 2: 1. Lot 3: 2. Total: 4.

1.2 Site establishment per borehole: access improvement, clearing, levelling, lined mud pit, fencing, signage and spill containment (5 km radius). Unit: Borehole. Lot 1: 6. Lot 2: 6. Lot 3: 6. Total: 18.

2 DRILLING, SAMPLING AND LOGGING

2.1 Drilling surface section, bit not less than 12 in (305 mm), 0 to 15 m, including temporary casing, sampling and logging. Unit: M. Lot 1: 90. Lot 2: 90. Lot 3: 90. Total: 270.

2.2 Drilling main hole, 15 m to design depth (budget 100 m), bit not less than 8 in (203 mm) passing freely through the 250 mm surface casing, including sampling, logging and yield measurement (the extra metre below design depth is not paid). Unit: M. Lot 1: 510. Lot 2: 510. Lot 3: 510. Total: 1530.

3 CASING, SCREENS, GRAVEL PACK, SANITARY SEAL, DEVELOPMENT AND HEADWORKS

3.1 Supply and install 250 mm OD uPVC Class 10 (PN10) surface casing, 0 to 15 m plus a stick-up of not more than 1.0 m, grouted in place. Unit: m. Lot 1: 96. Lot 2: 96. Lot 3: 96. Total: 288.

3.2 Supply and install 140 mm OD uPVC Class 10 (PN10) plain casing, solvent-cement jointed, including sump and a stick-up of not more than 1.0 m. Unit: m. Lot 1: 462. Lot 2: 462. Lot 3: 462. Total: 1386.

3.3 Supply and install 140 mm OD uPVC Class 10 (PN10) slotted screen, solvent-cement jointed, slots 0.8 to 1.0 mm. Unit: m. Lot 1: 144. Lot 2: 144. Lot 3: 144. Total: 432.

3.4 Supply and install dedicated glued uPVC bottom plug. Unit: No. Lot 1: 6. Lot 2: 6. Lot 3: 6. Total: 18.

3.5 Supply and install centralisers at 6 m intervals on casing and screens. Unit: No. Lot 1: 102. Lot 2: 102. Lot 3: 102. Total: 306.

3.6 Supply, sieve and place clean quartz gravel pack to 3 m above top screen. Unit: m3. Lot 1: 4.8. Lot 2: 4.8. Lot 3: 4.8. Total: 14.4.

3.7 Bentonite seal, backfill and cement grouting to form the sanitary seal. Unit: Borehole. Lot 1: 6. Lot 2: 6. Lot 3: 6. Total: 18.

3.8 Development by jetting and airlift surging, minimum 1 hour per borehole and until clear and 5 NTU or less (hours worked). Unit: Hour. Lot 1: 6. Lot 2: 6. Lot 3: 6. Total: 18.

3.9 Headworks: reinforced concrete apron, lockable chamber, sanitary cap and identification plate (built after H4). Unit: Borehole. Lot 1: 6. Lot 2: 6. Lot 3: 6. Total: 18.

4 CAPACITY TESTING AND WATER QUALITY (RATE ONLY - may be awarded as stand-alone Lot T; quantities indicative for 18 boreholes; not included in Lot 1-3 totals)

4.1 Mobilisation and demobilisation of test-pumping unit to the ward (per ward visit). Unit: Item. Lot 1: 1. Lot 2: 1. Lot 3: 2. Total: 4.

4.2 Step-drawdown test, 4 steps of 60 minutes, including test pump, generator, measuring equipment and recovery monitoring (not paid separately). Unit: Hour. Lot 1: 24. Lot 2: 24. Lot 3: 24. Total: 72.

4.3 Constant-rate test, 8 hours at design rate of at least 1.0 L/s (or rate approved by AAZ), including recovery monitoring (not paid separately). Unit: Hour. Lot 1: 48. Lot 2: 48. Lot 3: 48. Total: 144.

4.4 Water sample collection and accredited laboratory analysis of all Annex E1 parameters. Unit: Borehole. Lot 1: 6. Lot 2: 6. Lot 3: 6. Total: 18.

4.5 Disinfection of borehole and record of residual chlorine. Unit: Borehole. Lot 1: 6. Lot 2: 6. Lot 3: 6. Total: 18.

5 PROVISIONAL ITEMS (rate only; paid only on written Site Instruction and measured quantity; quantities are for price comparison)

5.1 Additional depth beyond 100 m: drilling and 140 mm casing complete, per metre. Unit: m. Lot 1: 60. Lot 2: 60. Lot 3: 60. Total: 180.

5.2 Additional development hours beyond the 1-hour minimum. Unit: Hour. Lot 1: 12. Lot 2: 12. Lot 3: 12. Total: 36.

5.3 Decommissioning, sealing and backfilling of a failed borehole. Unit: Borehole. Lot 1: 1. Lot 2: 1. Lot 3: 1. Total: 3.

Annex E3 Capacity test reading frequency and log sheet

Step test (each 60-minute step): 0 to 10 min / 10 to 30 min / 30 to 60 min. Reading interval: every 1 min / every 5 min / every 10 min.

Constant-rate test: 0 to 30 min / 30 to 120 min / 2 to 8 h. Reading interval: every 5 min / every 15 min / every 30 min.

Recovery (after each test): 0 to 10 min / 10 to 30 min / 30 to 60 min and beyond. Reading interval: every 1 min / every 5 min / every 10 min.

Log sheet fields: borehole number, ward, date, pump type and setting depth, static water level, time, elapsed time, dynamic water level, drawdown, discharge, temperature, EC, weather, remarks and signatures.

Annex E5 Site Schedule

Lot 1: W13-VBU1-BH1, W13-VBU1-BH2 (Ward 13, VBU 1); W13-VBU2-BH1, W13-VBU2-BH2 (Ward 13, VBU 2); W13-VBU3-BH1, W13-VBU3-BH2 (Ward 13, VBU 3). Use: VBU.

Lot 2: W19-VBU1-BH1, W19-VBU1-BH2 (Ward 19, VBU 1); W19-VBU2-BH1, W19-VBU2-BH2 (Ward 19, VBU 2); W19-VBU3-BH1, W19-VBU3-BH2 (Ward 19, VBU 3). Use: VBU.

Lot 3: W13-VBU4-BH1, W13-VBU4-BH2 (Ward 13, VBU 4); W13-PWS-BH1 (Ward 13, Piped Water Scheme); W19-VBU4-BH1, W19-VBU4-BH2 (Ward 19, VBU 4); W19-PWS-BH1 (Ward 19, Piped Water Scheme). Use: VBU, and Scheme for the two piped water scheme boreholes.

18 boreholes: Ward 13 has 9 (VBUs 1 to 4 × 2, plus the scheme); Ward 19 has 9. AAZ is to insert VBU names and coordinates before issue.

Annex E6 Forms and templates

  • Bid forms: B-1 Bid submission form; B-2 Bidder information; B-3 Declaration of acceptance, conflict of interest, anti-fraud and safeguarding; B-4 Key personnel CVs; B-5 Equipment schedule; B-6 Work plan and programme.
  • Contract forms: Site Instruction Form; Site Inspection (hold-point) Form; Variation Order; Capacity-testing log sheet.

Pump Design Data Sheet (one per borehole). Fields: borehole ID, ward, site, coordinates; total depth and date completed; casing: 140 mm OD, internal diameter, screen intervals, sump depth; static water level (m below ground); tested yield and recommended pumping rate (L/s); pumping water level at test rate (m); recommended pump setting depth (m); recommended daily pumping hours; water quality notes (including any variance); prepared by (hydrogeologist) and date.

Completion Certificate (one per borehole). Items: borehole ID and lot; H1 to H6 signed and dated (attach forms); acceptance criteria in C5 met: yes / no (attach schedule); defects or outstanding works; DLP start date (H6) and end date; signed: AAZ Client’s Representative, DWSSC, EHT, community representative, Contractor.

BILL OF QUANTITIES (Excel pricing form)

Borehole drilling, casing, development and sanitary seal (Lots 1 and 2) and capacity testing (rates for Lot T). BRACES Project, Binga District, Wards 13 and 19. Bill of Quantities, Annex E2. Bidder name: ______________________________. Rates in USD, excluding VAT. Enter rates in the yellow column only.

1 MOBILISATION AND SITE ESTABLISHMENT

1.1 Mobilisation and demobilisation of drilling rig, crew and equipment to the ward. Distances: Cross Dete to Ward 13 centre 67 km; Cross Dete to Ward 19 centre 70 km. Unit: Item. Total quantity: 2. Basis: Fixed. Spec ref: A7, D2.

1.2 Site establishment per borehole: access improvement, clearing, levelling, lined mud pit, barrickad fencing, signage and spill containment (5 km radius). Unit: Borehole. Total quantity: 18. Basis: Fixed per borehole. Spec ref: A6, C4.

2 DRILLING, SAMPLING AND LOGGING

2.1 Drilling surface section, bit not less than 12 in (305 mm), 0 to 15m, including temporary casing, sampling and logging. Unit: m. Total quantity: 270. Basis: Re-measurable. Spec ref: C2, C3.2, C3.3.

2.2 Drilling main hole, bit not less than 8 in (203 mm), from 15 m to design depth (budget 100 m), passing freely through the 250 mm surface casing, including sampling, logging and yield measurement (the extra metre below design depth is not paid). Unit: m. Total quantity: 1,530. Basis: Re-measurable. Spec ref: C2, C3.2, C3.3.

3 CASING, SCREENS, GRAVEL PACK, SANITARY SEAL, DEVELOPMENT AND HEADWORKS

3.1 Supply and install 250 mm OD uPVC Class 10 (PN10) surface casing, 0 to 15 m plus a stick-up of up to 1.0 m, grouted in place. Unit: m. Total quantity: 288. Basis: Re-measurable. Spec ref: C3.4.

3.2 Supply and install 140 mm OD uPVC Class 10 (PN10) plain casing, solvent-cement jointed, including sump and a stick-up of at least 1.0 m. Unit: m. Total quantity: 1,376. Basis: Re-measurable. Spec ref: C3.4.

3.3 Supply and install 140 mm OD uPVC Class 10 (PN10) slotted screen, solvent-cement jointed, slots 0.8 to 1.0 mm. Unit: m. Total quantity: 432. Basis: Re-measurable. Spec ref: C3.4.

3.4 Supply and install dedicated glued uPVC bottom plug. Unit: No. Total quantity: 18. Basis: Fixed per borehole. Spec ref: C3.4.

3.5 Supply and install centralisers at 6 m intervals on casing and screens. Unit: No. Total quantity: 306. Basis: Re-measurable. Spec ref: C3.4.

3.6 Supply, sieve and place clean quartz gravel pack to 3 m above top screen. Unit: m3. Total quantity: 14.0. Basis: Re-measurable. Spec ref: C3.5.

3.7 Development by jetting and airlift surging, minimum 1 hour per borehole and until clear and 5 NTU or less (hours worked). Unit: Hour. Total quantity: 18. Basis: Re-measurable. Spec ref: C3.8.

3.8 Headworks: 15 Mpa concrete apron, lockable chamber, sanitary cap and identification plate (built after H4). Unit: Borehole. Total quantity: 18. Basis: Fixed per borehole. Spec ref: C3.7.

4 CAPACITY TESTING AND WATER QUALITY (RATE ONLY - may be awarded as stand-alone Lot T; quantities indicative for 18 boreholes)

4.1 Mobilisation and demobilisation of test-pumping unit to the ward (per ward visit). Unit: Item. Total quantity: 2. Basis: Rate only. Spec ref: C3.9.

4.2 Step-drawdown test, 4 steps of 60 minutes, including test pump, generator, measuring equipment and recovery monitoring (not paid separately). Unit: Hour. Total quantity: 72. Basis: Rate only. Spec ref: C3.9.

4.3 Constant-rate test, 8 hours at design rate of at least 1.0 L/s (or rate approved by AAZ), including recovery monitoring (not paid separately). Unit: Hour. Total quantity: 144. Basis: Rate only. Spec ref: C3.9.

4.4 Water sample collection and accredited laboratory analysis of all Annex E1 parameters. Unit: Borehole. Total quantity: 18. Basis: Rate only. Spec ref: C3.10.

5 PROVISIONAL ITEMS (rate only; paid only on written Site Instruction and measured quantity; quantities are for price comparison)

5.1 Additional depth beyond 100 m: drilling and 140 mm casing complete, per metre. Unit: m. Total quantity: 180. Basis: Provisional. Spec ref: C2, D4.

5.2 Additional development hours beyond the 1-hour minimum. Unit: Hour. Total quantity: 18. Basis: Provisional. Spec ref: C3.8, D4.

5.3 Decommissioning, sealing and backfilling of a failed borehole. Unit: Borehole. Total quantity: 2. Basis: Provisional. Spec ref: C5, D3.

Lot summary (USD, excluding VAT): total firm items (Sections 1 to 3); total provisional items (Section 5; paid only on written Site Instruction); lot total for evaluation (Sections 1 to 3 and 5), excluding VAT; price per borehole (lot total divided by 6 boreholes); Lot T indicative total for evaluation (Section 4, rate only, all 18 boreholes; NOT included in lot totals).

Bidder signature and stamp: ______________________________ Date: ____________

Requirements

PART B: BID SUBMISSION, EVALUATION AND AWARD

B1 Bid submission, validity and clarifications

Issue date: Saturday 14 November 2026.

Clarifications: Written questions to procurement.zimbabwe@actionaid.org by Monday 16 November 2026 1700hrs. AAZ will answer all questions in writing to all bidders by Wednesday 18 November 2026 by 1700hrs. No other channel is official.

Site visit: Not mandatory (encouraged).

Bid closing: Monday 23 November 2026 at 1700hrs, at procurement.zimbabwe@actionaid.org. Late bids are rejected.

Bid opening: Wednesday 25 November 2026 at 26 Divine Road, Milton Park. Technical proposals are opened first; financial proposals are opened only for bidders who pass Stage 1 and reach the technical pass mark.

Bid validity: 90 calendar days from the closing date.

Format: Two separate parts: (1) Technical Proposal with Stage 1 documents, and (2) Financial Proposal (completed Annex E2 BOQ in Excel and PDF). All forms in Annex E6 must be completed and signed.

Currency and tax: USD. Rates exclude VAT (D14).

Lots: State the lot(s) bid for. If bidding for more than one drilling lot, give an order of preference (used only as the last tie-break in B5). State whether Lot T rates are offered (Section 4 of the BOQ must be fully priced to be considered for Lot T). A bidder may bid for Lot T alone.

B2 Stage 1: Preliminary and Mandatory Compliance (pass/fail)

Failure to submit or satisfy any of the following results in disqualification

  • Valid company registration (Certificate of Incorporation).
  • Valid tax clearance certificate.
  • Valid ZINWA drilling contractor registration (drilling lots).
  • Minimum experience in A5 with client reference letters or completion certificates.
  • Rig ownership or lease agreement for an operational rig rated to at least 130 m (drilling lots); test equipment evidence (Lot T).
  • CVs and professional certificates for the key personnel in A5.
  • Site-specific HSE and environmental plan.
  • Signed declarations: acceptance of tender terms; safeguarding commitment and code of conduct; conflict of interest; anti-fraud, anti-bribery and non-collusion (D10).

B3 Stage 2: Technical and Financial evaluation (100 points)

  1. Track record and experience (20 points): Depth and relevance of past borehole contracts, Binga or Zambezi valley experience, reference checks.
  2. Technical methodology and work plan (15 points): Method statement including the drilling and casing procedure for the 12 in surface and 8 in main holes, gravel placement through the narrow annulus, mud control, mobilisation logistics, sand aquifers and flooding risk, and a programme that meets the 15-day target.
  3. Equipment capacity and verification (15 points): Rig condition, compressor rating (at least 21 bar / 900 CFM, or another size justified as fit for the Works), dip meters, back-up equipment; for Lot T the test pump, generator and flow-measurement equipment.
  4. Key personnel (10 points): CV strength, accreditation and years of experience of the supervisor, hydrogeologist and test technician.
  5. HSE, environmental and safeguarding (10 points): Robustness of the HSE plan, wildlife management, waste containment, worker protection and PSEAH measures.

Technical total (70 points): Minimum technical pass mark 70 percent = 49 of 70 points to qualify for financial opening.

  1. Financial proposal (30 points): Price score = (lowest evaluated price ÷ bidder’s evaluated price) × 30.

TOTAL: 100 points.

B4 Financial evaluation

  • One set of rates applies to any lot awarded. The evaluated price of a lot is the lot total in Annex E2 (Sections 1 to 3 plus provisional Section 5 at the stated quantities, excluding VAT). Section 5 is included only to compare rates; it is paid only as instructed.
  • Arithmetic errors are corrected by AAZ; unit rates prevail over amounts. Unpriced items are treated as included in other rates.
  • Lot T is priced from Section 4 rates on the indicative quantities (all 18 boreholes) and scored separately from Lots 1 to 3. Section 4 rates do not affect the Lot 1 to 3 financial score.
  • Bidders must give a total price per borehole and a consolidated price for each lot bid (Annex E2 summary).

B5 Award and allocation of lots

  1. Ranking. Each bidder that reaches the technical pass mark is scored for each drilling lot it bids for: technical score plus financial score (out of 100), with the financial score based on the evaluated price of that lot (B4).
  2. Each bidder must demonstrate capacity for two lots (18 boreholes in the target programme) with its own rig, crew and key personnel.
  3. Lot T (capacity testing). Lot T bids are scored in the same way: technical score for testing, and financial score from the Section 4 evaluated price (B4). AAZ awards Lot T in whole to the highest-scoring qualified Lot T bidder. Where programme, access or cost makes it better value, AAZ may instead award Lot T by lot to the drilling contractor of each lot at that contractor’s quoted Section 4 rates, or split it between contractors, recording its reasons in writing. A bidder may bid for a drilling lot alone, for Lot T alone, or for both. Award of one does not depend on award of the other, and no price may be conditional on winning both.
  4. AAZ may award fewer than three lots or re-tender any lot where bids are insufficient, non-responsive or above budget, in line with AAZ and donor rules and with documented reasons.

Contractor qualifications and key personnel (A5)

Drilling Lots 1 to 3: registered drilling contractor; at least 3 completed borehole contracts of 80 m or more in the last 5 years; own or leased rig with depth capacity of at least 130 m, able to drill a 12 in (305 mm) surface hole and an 8 in (203 mm) main hole; compressor of at least 21 bar / 900 CFM, or another size that the bidder justifies as fit for the Works. Experience of drilling in Binga terrain is a plus. Key personnel (CVs submitted with bid, approved by AAZ): drilling supervisor (at least 5 years) on site throughout; hydrogeologist (may also be the siting hydrogeologist) to log and approve design; test-pumping technician (at least 3 years of capacity-testing experience), required in every bid.

Lot T (Yield testing): at least 3 completed step-drawdown and constant-rate test assignments in the last 5 years; own or leased test pump (at least 3 L/s at +130 m head), generator, flow meter and dip meters. Key personnel: test-pumping technician (at least 3 years of capacity-testing experience); hydrogeologist or analyst for test interpretation.

How to submit: send your bid by email to procurement.zimbabwe@actionaid.org. Bid closing: Monday 23 November 2026 at 1700hrs. Late bids are rejected.

Written questions go to procurement.zimbabwe@actionaid.org by Monday 16 November 2026 at 1700hrs. ActionAid Zimbabwe will answer all questions in writing to all bidders by Wednesday 18 November 2026 by 1700hrs. No other channel is official.

Bid opening: Wednesday 25 November 2026 at 26 Divine Road, Milton Park.

How to apply

Send your application to procurement.zimbabwe@actionaid.org with the subject “Application: Tender 11/26: Borehole Drilling, Casing, Development and Capacity Testing, BRACES Project, Binga District (Wards 13 and 19)”, before 23 Nov 2026.

Apply by email

Only shortlisted candidates will be contacted. Recruitment263 never charges applicants, and this employer should not either.

What's wrong with this job?

Reason

We never share who reported a job. If someone has asked you for money, don't send it.

Similar jobs

  1. Planning Clerk (C2)Zimbabwe Parks and Wildlife Management Authority (ZimParks) · HarareCloses today, 17 Nov 2026
  2. Experienced Crane OperatorNational Cranes and Equipment (Pvt) Ltd · HarareCloses 2 Dec 2026
  3. CONSTRUCTION SITE QA/QC OFFICERThaton Property · HarareCloses 30 Nov 2026
  4. CONSTRUCTION SITE SURVEYORThaton Property · HarareCloses 30 Nov 2026
See all jobs

Closes 23 Nov 2026

Apply by email Save this job

Only shortlisted candidates will be contacted.

Organisation

AZ

ActionAid Zimbabwe Verified employer

NGO · Harare

Back About this organisation
Applying for this role?Build an ATS-friendly CV free on CV263.

Share this opportunity

WhatsApp X / Twitter LinkedIn
Follow our WhatsApp channel
Apply by email

We’re here to help

Questions about a job, your account or posting a vacancy? Talk to a real person.

WhatsApp us (opens in a new tab) Email us +263 78 628 0414
Recruitment263 home

Zimbabwe’s job board and hiring platform. Free to post, free to apply.

We confirm by email first. Unsubscribe any time.

Jobseekers

  • Why Recruitment263 for jobseekers
  • Find jobs
  • Internships
  • Volunteer roles
  • Consultancies
  • Tenders and RFPs
  • Companies hiring
  • Create a jobseeker account

Employers

  • Why Recruitment263 for employers
  • Post a job free
  • Create an employer account
  • Find candidates
  • Let us hire for you (opens in a new tab)
  • Advertise with us
  • Sign in

Resources

  • Blog
  • Webinars
  • Job-seeker safety
  • About us
  • RSS feed
  • Sitemap

Popular job searches

  • Graduate trainee jobs
  • Government jobs
  • NGO jobs
  • Teaching jobs
  • Nurse aide jobs
  • General worker jobs
  • Truck driver jobs
  • ICT jobs
  • Security jobs
  • Procurement jobs
  • Industrial attachment
  • Jobs for returning Zimbabweans
  • Herald jobs
  • Sunday Mail jobs
  • Vacancies 2026

Jobs by city

  • Jobs in Harare
  • Jobs in Bulawayo
  • Jobs in Mutare
  • Jobs in Gweru
  • Jobs in Masvingo
  • Jobs in Kwekwe
  • Jobs in Victoria Falls
  • Jobs in Chinhoyi
  • Jobs in Bindura
  • Jobs in Kadoma
  • Jobs in Rusape

Build your CV with CV263

  • Free CV builder (opens in a new tab)
  • CV templates (opens in a new tab)
  • CV for attachment (opens in a new tab)
  • How to write a CV (opens in a new tab)
  • Application letter guide (opens in a new tab)

We never charge applicants. Any job that asks you for money is a scam. Report it

Every post is scam-checked. Verified employers carry a tick.

Your data is protected. Read how we handle it in our privacy policy.

© 2026 Recruitment263, a service of Fignoc Technologies, Harare, Zimbabwe

  • About
  • Privacy policy
  • Job-seeker safety
  • Sitemap

Need an up-to-date CV?

Applying for jobs? Build a professional CV in minutes and give employers a reason to shortlist you.

  • Ready in under 5 minutes
  • Reviewed by HR professionals
  • Score your CV against any vacancy
Create my CV

Powered by CV263

New jobs, first thing every morning

Join our WhatsApp channel for daily job updates and application tips: the freshest Zimbabwean vacancies straight to your phone, before they spread anywhere else.

  • Daily job updates
  • Application tips
  • Free, no spam
Join the channel

One tap to follow · leave whenever you like